News and Information for Tunnel in Europe Austria: Felber Tauern route blocked after rockslide After a massive rockslide the route remains locked during the B108 once. The block will last at least until Pentecost, a detour is posted. More information and the source of messages. Citizen participation for connection to Brenner Base Tunnel begins The track begins with the German citizen participation for the Bavarian connection to the Brenner Base Tunnel. The planned route of the so-called access route from Munich to Kiefersfelden the tunnel is controversial Are in Rosenheim on Wednesday mayor of affected municipalities, councilors and MPs from the region to an information meeting of German Railways (DB) and invited Austrian Federal Railways (ÖBB). "We is an early, open and constructive cooperation with all stakeholders is very important," reads the invitation to the meeting. The planned route of the so-called access route from Munich to Kiefersfelden the tunnel is controversial. Especially in the Inn Valley there are massive protests. Mayor defend themselves vehemently against the proposed four-track aboveground expansion through their communities. The Federal Nature Conservation in Bavaria (BN) keeps the project on transport policy redundant, inefficient and cost-prohibitive. The tunnel itself will cost EUR 8 billion, the Bavarian side for trains to EUR 2.6 billion. With the commissioning is not expected before 2032. The goal is to accelerate the train transit across the Alps Tyrol and South Tyrol as well as relieve the daily truck traffic. (Lby / pkl) SDR: New tunnel regulations in Switzerland This adaptation of the Swiss dangerous SDR rules on the changes of the ADR 2013, Switzerland has also made some changes in their tunnel systems (Annex 2 No. 1.9.5 SDR). This was reported by the IHK Schwaben in their latest newsletter dangerous. After three tunnels in Graubünden (Solis, Alvaschein and agricultural water tunnel) from the list restriction (tunnels Category E) have fallen out. In addition, two new routes in the cantons of Solothurn and St. Gallen (Annex 2 No. 1.9.6 SDR) were blocked for water pollutants. BYPASS TUNNEL ADAC provides information about autumn cleaning event for St. Gotthard ADAC (03.09.2012) Twice a year - in spring and autumn - maintenance work is performed in the Swiss St. Gotthard tunnel. So that motorists are not suddenly faced with a locked entrance of the tunnel, the ADAC has compiled the dates for the autumn flush in September. Of 10 September until the early morning hours of 14 September is placed on the A2 between Göschenen and Airolo on glossy Swiss St. Gotthard tunnel. Respectively 22-5 Clock lasting maintenance. Similarly, in the four nights of 17 to 21 September and between 24 September and 28 September is cleaned 22-5 clock in the morning. On the weekend until Monday evening 22 clock no maintenance is performed. During the night, the driver can lock via the nearby St. Gotthard Pass or widely throughout the San Bernardino route A 13 Chur - Bellinzona dodge. When more tubes are affected, motorists learn at www.adac.de / reise_freizeit / traffic / aktuelle_verkehrslage by the current traffic conditions. Travelers receive individual advice under the mobile speed dial 4 22 11 (1,10 € / min + connection costs;. Choose E-Plus customers 11 4 11). Source: ADAC Please note that the report reflects the state of affairs at the time of publication.  Partner :  ______________________ Wählen Sie ihre Sprache choose your language GLL Gefahrgut Ladungssicherung & Logistic GmbH - Ulzburger Strasse 42b - 22399 Hamburg - Tel.: +49 (0)40 3596 1914 - Fax: +49 (0)40 3596 0864